Major Projects |
|
|
|
|
|
Aviation
|
|
Terminal 4 – International
Arrivals Terminal JFK |
|
Owner: |
IAT
LLC |
Location: |
JFK
International Airport,
Jamaica, NY |
Client: |
AMEC Construction Management, Inc. |
Value: |
$34,500,000 |
|
The Terminal 4 project included a new 1.5 million square foot Terminal in JFK International Airport. E-J provided all power and lighting, lighting control system, deluge system, metering system and SCADA system. State-of-the-art architectural lighting was placed throughout the terminal. The three level glass walled central terminal building services 35 US and International carriers. There is an 850 foot long retail hall and the top level has a 500x400 departure lobby and 144 check-in positions. There is an 850 foot long retail hall. Special installations were performed for the International and US customs Departments. JFK's first Air Transit Station inside of a terminal is located between levels. |
American Airlines
Concourse C |
|
Owner: |
American
Airlines |
Location: |
JFK
International Airport
Jamaica, NY |
Client: |
VRH/Torcon |
Value: |
$29,000,000 |
|
This project was part of the overall redevelopment of the American Airlines Terminal at JFK International Airport. E-J's scope was the primary service to all three substations on the site. In Concourse "C" E-J did all the distribution and entire building fit-out. Each substation was a "4pack" consisting of four lineups of S&C 5kV switch, transformers, network protector and network disconnect. At Concourse C the installation consisted of the collector bus and (2) 5000 Amp 480 Volt services as well as the installation of Taxi Way Lighting and Control. |
IAC Cargo Buildings |
|
Owner: |
International
Airport Center |
Location: |
Rockaway Blvd.
off of JFK Airport
Springfield Gardens, NY |
Client: |
VRH Construction |
Value: |
$8,000,000 |
|
E-J
provided site development for the International Airport
Center Cargo Buildings including underground distribution of
power and telephone duct banks. Four warehouse buildings approximately
120,000 square feet were built out, each including electrical
service/power distribution to HVAC, elevators, fire alarm system
and interior/exterior open warehouse and office lighting/power. |
British Airways,
JFK |
|
Owner: |
British Airways |
Location: |
Rockaway Blvd. off of JFK Airport
Springfield Gardens, NY |
Client: |
VRH |
Value: |
$8,000,000 |
|
E-J performed the complete electrical terminal expansion
including lighting, power, medium voltage substations,
fire alarm and communications infrastructure. Included
in the communications infrastructure was a universal
voice and data cabling system feeding separate IBM and
Wang Data Centers as well as providing interfaces with
the Port Authority. The communications infrastructure
also included a public address system and card key security
system. The total amount of low voltage control, signaling
and information distribution wiring consisted of 200,000
feet of copper cable distributed to more than 1750 termination
points. We performed the complete electrical terminal
expansion including lighting, power, medium voltage substations,
150kW generator, fire alarm and communications infrastructure. |
Gate Gourmet |
|
Owner: |
Gate Gourmet |
Location: |
Inwood, NY |
Client: |
VRH Construction |
Value: |
$3,650,000 |
|
Existing
warehouse building converted to Aviation food service facility.
We installed new service and power distribution including
new lighting, office space and fire alarm system. The scope
also included the complete renovation of existing trucking
warehouse into food service facility with large drive-in
freezers, coolers, chilled food preparation area, cook
line and dishwashing lines. Installation of extensive life safety system included a VESDA system. |
Delta Airlines Y2K |
|
Owner: |
Delta Airlines |
Location: |
JFK International Airport
LaGuardia Airport & JFK Cargo
Jamaica, NY |
Client: |
VRH Construction Co. |
Value: |
$3,300,000 |
|
Complete
Lucent certified data installation at Delta NY facilities,
JFK Terminals 2 & 3, JFK Cargo Building 67, LaGuardia
Airport Shuttle and Flight Center. Our work included the main
computer rooms with emergency power, UPS installation,
redundant power feeds and complete rack and cable tray
installation. New clean power feeds were developed for
satellite closets and were linked to the main computer
rooms via diverse redundant EMT fiber optic runs. Over
2500 gigaspeed drops were installed utilizing over 90 miles
of UTP cable. The majority of work performed in security sensitive active "airside" locations. |
Terminal One – JFK
Fire Alarm System |
|
Owner: |
Terminal One Group
Associates |
Location: |
JFK International Airport
Jamaica, NY |
Client: |
AMEC Construction Management, Inc. |
Value: |
$3,000,000 |
|
E-J installed
fire alarm system in this new facility interfacing with mechanical systems,
lighting controls, security system and public address system,
in accordance with Port Authority codes and standards.
This $400 million, 600,000 sq. ft., 2.5-story airline passenger
terminal is a "radial" building incorporating
complex spatial geometry that consists of the intersection
of a torus (a donut shape) with a flat plane along the
entrance. The building's dimensions are not uniform, requiring
individual and different connections on radii. To meet
the challenges posed by a lack of uniform dimensions, the
construction manager used the structural steel shop drawings
to establish dimensions and then allow other trades to
use these dimensions. |
Korean Air Cargo |
|
Owner: |
Korean Airlines |
Location: |
Building 260
JFK International
Airport |
Client: |
Turner Construction Co. |
Value: |
$1,400,000 |
|
E-J's installation included dual 5kV building utility feeds, site lighting, communications and power feeds as well as feeds for airplane ground power units for the entire site including Cargo Building, future Cargo Building and surrounding airside work. The work also included ten manholes throughout the site. |
Airtrain |
|
Owner: |
ARTC |
Location: |
JFK International Airport
Jamaica, NY |
Client: |
Slattery Skanska |
Value: |
$1,100,000 |
|
Completion
of electrical work on JFK International Airport's Airtrain
System included track lighting, signal, and station work.
Airtrain is a ten station 8.4 mile automated, driverless,
standard gauge steel rail system operating over an exclusive,
mostly elevated guideway. Airtrain connects JFK Central
Terminal Area consisting of six stations linking nine terminals
to the Howard Beach Subway Station, Long Term Parking Station,
Federal Circle Car Rental Station, and Jamaica LIRR/Subway
Station. |
Lufthansa Cargo
Security |
|
Owner: |
Lufthansa Airlines |
Location: |
JFK International Airport,
Tract 8
Jamaica, NY |
Client: |
Siemens Building Technologies |
Value: |
$463,815 |
|
Installation of access control and CCTV Cameras in the Office Building, Customer Service Center, Cargo, Warehouse and the Vaults with sub-grade duct bank distribution. |
Air Traffic Control
Tower |
|
Owner: |
JFK IAT |
Location: |
Terminal 4, JFK International
Airport
Jamaica, NY |
Client: |
VRH Construction |
Value: |
$187,000 |
|
Complete
renovation of International Arrivals Building and Terminal
Ramp Control Tower including a new fire alarm system FM200,
fire suppression system, smoke purge, and lighting and
power. |
Delta Song |
|
Owner: |
Delta Airlines |
Location: |
JFK International Airport,
Terminal #8
Jamaica, NY |
Client: |
VRH Construction |
Value: |
$180,000 |
|
Renovation
of storage area into new Delta Song offices including sub-panelboards,
lighting, power, telephone data and extensive design/build
fire alarm work. Work included an addition of outside quartz
halogen lighting & electrical sub-panels including
control photocell and timer via split bus contactor panelboard. |
Port Authority Police
Station JFK, Building 269 |
|
Owner: |
Port Authority
of New York & New Jersey |
Location: |
JFK International Airport
Jamaica, NY |
Client: |
VRH Construction Co. |
Value: |
$2,300,000 |
|
Fast track addition to existing building renovation including New Police Desk CCTV, sound, security and fire alarm systems while owner continued to function as Airport Police and Fire Station. |
American Airlines – Terminal
9 |
|
Owner: |
American Airlines |
Location: |
JFK International Airport
Jamaica, NY |
Client: |
VRH Construction Co. |
Value: |
$1,600,000 |
|
Installed
lighting and power updates at American Airlines Terminal
9. Reworked lighting and power. Installed lighting and
power for new passenger baggage claim area. |
Delta Airlines – Concession
Program Terminal 2 & 3 |
|
Owner: |
Delta Airlines |
Location: |
JFK International Airport
Jamaica, NY |
Client: |
VRH Construction Co. |
Value: |
$700,000 |
|
Developed
tenant spaces in respect to landlord services. Brought
power, fire alarm, communications, etc. to 25 tenant areas.
Project included Terminal 3 South Concourse complete lighting
renovation. |
Air France @ Terminal
One |
|
Owner: |
Air France |
Location: |
JFK International Airport
Jamaica, NY |
Client: |
Crow Construction |
Value: |
$500,000 |
|
1st class
Lounge and Office Area for JFK Air France operation. Installations
included architectural lighting and horizontal Cat5 cabling
of the Air France Passenger Terminal. |
American Airlines Cargo Building #123 JFK International Airport |
|
Owner: |
American Airlines |
Location: |
JFK International Airport
Jamaica, NY |
Client: |
VRH Construction Corporation |
Value: |
$700,000 |
|
Cargo Building #123 at JFK International Airport is American Airlines premier cargo handling facility in the northeast. E-J won this contract thru competitive bidding after budgeting and value engineering the project for close to one year.
This project involved installing over 120 work stations in a 150,000 square foot facility. The environment ranged from a controlled office environment to a warehouse environment. The project included approximately 100 Intelligent work stations and 20 Bar Code Scanning work stations all with SABRE connectivity.
Since the facility is a large single level design, running footage quickly accumulates. This translates into a critical LAN design. The data, clean power and grounding specifications had to be closely monitored. The final design evolved into a single TI Room with 3 satellite closets and 3 concurrent LANS.
One value engineering concept that E-J spearheaded was fiber optics. E-J engineered the communication system between the TI Room and satellite closets. Our engineers changed the shielded twisted pair data cabling to a multimode fiber optic cable. This provided American Airlines a direct up front project savings of 5% and resulted in a more flexible installation.
Carrying the value engineering principles one step further E-J took a critical look at the fiber optic ST connectors. After evaluating many different connectors in respect to performance (db loss), price, and installation we selected Siecors new no polish, no heat connector. The connector met performance criterion and lowered project costs even further.
Another value engineering area that was carefully analyzed was raceways. The protection required by the copper and fiber optic cable differed as the installation environment changed. Free Air, Cable Tray, Inner Duct, Messenger, EMT and Galvenized conduit were all reviewed. Free Air, Cable Tray, and EMT were utilized after careful consideration because it provided the maximum cost effectiveness combined with the degree of protection that was actually necessary.
Once work actually began the schedule became a critical concern. E-J had to combine implementing "State of the Art Technology", with a compacted schedule. This project became American Airlines first data/telecommunications project at JFK International Airport to finish on time and below the budget. |
|
|
|
|
|
|
|
|
|
|