Power Construction |
|
|
|
|
|
Generation
|
|
Astoria Energy 500MW
Power Plant |
|
Owner: |
Astoria Energy LLC |
Location: |
17-10 Steinway Street
Astoria,
Queens |
Client: |
Shaw Stone & Webster |
Value: |
$57,000,000 |
|
A new 500 megawatt
highly efficient electric generating facility using state-of-the-art combined-cycle, technology and
air pollution control systems. The major equipment includes
combustion turbines, heat recovery steam generators, air
pollution controls and steam turbines. The facility uses air cooled condensers for the cooling system to significantly
minimize water consumption. Natural
gas is the primary source of fuel with low sulfur distillate
fuel oil serving as a backup fuel for up to 720 hours annually.
The Plant, located in the Queens load pocket,
utilizes the transmission facilities at the existing
Con Edison Astoria East Substation approximately one-half
mile from the site to deliver clean, reliable electricity
to New York City and the surrounding region.
|
NYPA 500MW Poletti
Power Plant |
|
Owner: |
New York Power
Authority |
Location: |
31-03 20th Avenue
Astoria,
Queens |
Client: |
Slattery Skanska |
Value: |
$82,000,000 |
|
The work at the NYPA500 project included the erection, installation and testing of (2) 200MVA GSU, (1) 234MVA GSU and (2) auxiliary transformers, in addition to the installation and testing of (1) isolation transformer and (3) excitation transformers.
Dead end and PT structures along with associated 138kV switches were constructed to connect two of the three GSU transformers to the overhead transmission lines fed from the Astoria West substation. For design diversity, a pothead structure along with the associated switches was assembled to connect the third GSU to an underground 138kV feed which was also derived from the Astoria West ring bus.
The low side of these GSU transformers utilized a field welded 18kV Isophase bus to make the necessary connections to the combustion turbine and steam turbine generators as well as the auxiliary transformers. Power from the auxiliary transformers was delivered to the 4160V switchgear via a 5kV cable bus. |
Fresh Kills Methane
Recovery Plant |
|
Owner: |
DQE |
Location: |
100 Muldoon Avenue
Staten
Island |
Client: |
DQE |
Value: |
$7,650,000 |
|
New Methane Recovery Plant at the Freshkills Landfill in Staten Island. The electrical installation included two new methane Krysol processing systems and the upgrade of the existing Solexol plant and remote flare stations. The installation consisted of a new 15kV service with associated unit substations, MCC's and instrumentation. There were eight methane powered generators connected to independently power the processing plant.
|
Bayswater Peaking
Plant |
|
Owner: |
Florida Light & Power |
Location: |
Far Rockaway, Queens |
Client: |
Foster Wheeler |
Value: |
$6,295,000 |
|
E-J was brought
into this Peaking Plant project with only 8 weeks remaining
when the existing contractor couldn’t perform. Florida
Light & Power committed to sell electricity, with financial
penalties if the date wasn’t met. E-J mobilized sixty
electricians within two weeks, including engineering and
project management staff. The 8 week fast track installation
of a Pratt Whitney FT-8 twinpack 50-megawatt, gas fired
simple cycle peaking unit included turbines, site work,
feeders and all associated balance of plant systems. These
systems included de-mineralized water, CEM’s, SCR,
gas compressor, oily water separators and switchgear from
120V to 69kV. In addition, E-J was also responsible for
the installation of site lighting, heat trace, grounding
lightning protection, cathodic protection, fire detection
and protection, gas detection and all low voltage communication
systems such as telephone, CAT 5 and fiber optic WAN/LAN
Systems.
|
Jamaica Bay Peaking
Facility |
|
Owner: |
Jamaica Bay Peaking
Facility LLP |
Location: |
Far Rockaway, Queens |
Client: |
Florida Power and Light |
Value: |
$5,000,000 |
|
The Jamaica Bay Peaking Facility, located South of Jamaica Airport, serves the Long Island Power Autority grid as an additional energy source during high energy draw situations. Located on the same site, this plant runs in conjunction with the Bayswater Peaking facility constructed by E-J during the summer of 2002.
E-J also performed the installation of 15kV transmission yard equipment and interface to the Long Island Power Authority (LIPA) transmission lines. The design included bus duct from the station transformer into the transmission yard tower bus disconnect and the associated controls of the SCADA system. |
Montefiore Cogeneration |
|
Owner: |
Montefiore Medical
Center |
Location: |
111 E. 210th Street (Between
205th and Gunhill Road)
Bronx, NY |
Client: |
Keyspan Energy |
Value: |
$3,300,000 |
|
Cogeneration
plant consisting of a 4.5 MW 5kV solar gas turbine generator
waste heat boiler. Installation included (1) 5MW and (2)
2MW generators, cooling tower and two chillers. The project
included 5kV paralleling switchgear and associated unit
substations and MCC’s.
|
NRG Astoria Gas
Turbines - Transformers |
|
Owner: |
NRG |
Location: |
13th Avenue
Astoria, Queens |
Client: |
Shaw Stone & Webster |
Value: |
$985,660 |
|
At NRG we
replaced a 138kVA to a 13.8kVA transformer. In off peak
a transformer shorted out and destroyed all 13.8 feeders
and switchgear to Unit #12 G.T. We installed two 100kW
transformers because the original was too small and they
couldn't get one large enough. We also
installed 138kV bus structure to tie the high side of the
transformers together. We installed all new duct work and
medium voltage cables from the 13.8kV collector buses back to
each of four generator turbines. The job was accomplished
in approximately 4 1/2 weeks. Also in this time frame our
subcontractor, T. Moriarity & Sons, built a containment
around the new units. All new relay wiring and conduits
to transformers and collector bus back to relay house was installed.
In the relay house an extensive amount of rewiring had
to be done to accommodate two transformers instead of one
unit.
|
Northeast Generator
Mobile 66W Gas Turbine Generator |
|
Owner: |
Power Development
Corporation |
Location: |
7 Amelia Place
Stamford,
CT |
Client: |
Power Development Corporation |
Value: |
$322,000 |
|
A four week
crash installation of 66MW of a mobile gas turbine generator
for Power Development Corporation, Northeast Generator
required this outdoor peaking unit to meet super load requirements.
The three modular trailer mounted GE TM 2500 units were
fed using individual ladder trays with covers. The 13.8kV output was stepped up through a 75MVA transformer to
115kV. Other installations included the pumps for fuel
storage, all wiring for demineralized water used for emission
control, poles, overhead transmission work and spending
grid.
|
Con Edison Waterside Generator Facility |
|
Owner: |
Con Edison |
Location: |
1st Avenue & 39th Street
New York, NY |
Client: |
Con Edison |
Value: |
$2,700,000 |
|
Electrical installation of Asea Brown Boveri Turbine including all controls, LAN and 13.8kV Iso phase bus duct and switchgear.
|
|
|
|
|
|
|
|
|
|
|
|
|