E-J offers more completion work experience than any electrical contractor in the Country. We are chosen for our ability to mobilize quickly. Our engineering resources allow E-J to uniquely get control of a project and bring it to successful completion.
Bowery Bay Waste Water Treatment Plant Interim Upgrade Phase 1 |
|
Owner: |
City of NY, Dept. of Environmental Protection |
Location: |
45th Street & Berrian Blvd.
Astoria, Queens |
Client: |
XL Surety |
Value: |
$63,500,000 |
|
E-J Electric Installation was proud to have been selected for the completion of the electrical work for the upgrade of the Bowery Bay Water Pollution Control Plant. The project includes a $90 Million electrical component that was 12% complete when E-J took the project over for XL Surety, the Bonding company of the previous contractor. Included in the scope are medium voltage distribution, switchgear and substations spread over the 40-plus acre site and the conversion of the 208volt electrical distribution system to 480volt. Exacting specifications, a congested site and the necessity to keep the plant in operation, coupled with a demanding owner are some of the challenges that E-J Electric is overcoming on a daily basis.
|
LIRR Hillside
Car Maintenance Facility |
|
Owner: |
Metropolitan
Transportation Authority |
Location: |
9302 Archer Avenue
Jamaica, NY |
Client: |
Parsons Brinckerhoff/Morris Knudsen |
Value: |
$22,600,000 |
|
E-J was chosen for our experience, reputation and engineering to perform the electrical installation at the, fifteen acre, Long Island Railroad's Hillside Car Maintenance Facility. This $22 million time and material contract teamed E-J Electric with the Long Island Railroad, the construction manager, and the engineer in developing the most cost efficient method to complete systems ranging from Robotics to train motion alarm systems. All cost savings were returned to the Long Island Railroad. Their confidence in us was demonstrated by their doubling the original scope of our contract to include the most complex systems.
Specialty items on the job included signal work, train motion detection systems, rail lighting, forty foot high industrial lighting, public address, security, and fire alarm systems, automatic temperature control multiplex system, automated material handling robotics system, conveyer system, certified broadband communication cable, and a complete DC power distribution system including traction, trolley and auxiliary power systems. |
World Trade Center - Path
Station |
|
Owner: |
Port Authority
of New York & New Jersey |
Location: |
Church & Vessey
Streets
New York, NY |
Client: |
Yonkers Tully Pegno
JV |
Value: |
$22,500,000 |
|
E-J was selected by the Port Authority of New York and New Jersey with only six months remaining to complete the World Trade Center Path Station (New York) side of this fast track project. E-J performed $22 million of work on the Path Station in six months to meet the project completion date. The work included lighting, power, fire alarm, heat tracing, HVAC control system, RF Emergency Antenna
system, variable message signage, Closed Circuit Television Surveillance system, Passenger Emergency Telephone system, Motorman's Blue Light Telephone system, Passenger Information Display system, Corrosion Control system, Scada system, Traction Power system for the third rail, Public Address system and Uninterruptible Power Supply systems for this high usage Mass Transit railroad station. E-J is
proud to make this first phase of reconstruction of the World Trade Center site a success. |
LaGuardia
High School |
|
Owner: |
NYC Board
of Education |
Location: |
108 Amsterdam Avenue
New York, NY |
Client: |
Morrison Knudson |
Value: |
$11,000,000 |
|
The
installation of state-of-the-art auditorium and
theatre as final step in completing the country's
leading Performing Arts High School. Work included
all stage lighting, control systems, the installation
of a 200kW generator to provide power to critical
school loads, a fire alarm system and security
installation. |
Rihga Royal
Hotel/Concordia Hotel |
|
Owner: |
Rihga Royal
Hotel |
Location: |
151 West 54th Street
New York, NY |
Client: |
Tishman Construction |
Value: |
$10,000,000 |
|
The
completion of this 55-story hotel, consisting of 150 hotel suites, two restaurants and one parking
facility which E-J Electric was awarded after original
contractor could not fulfill their obligation to
builders. E-J was awarded the project at ten percent
electrical completion and worked to meet the demands
of a high-rise construction project. |
Myrtle Avenue
Subway Line |
|
Owner: |
NYC Transit
Authority |
Location: |
7 Stations between
Myrtle & Metropolitan Avenues
Brooklyn-Queens,
NY |
Client: |
Reliance Surety |
Value: |
$7,000,000 |
|
Completion
of all Transit Authority General Construction and
electrical work on a $7 Million seven station NYC Transit
rehabilitation project. Took over for Bonding
company from defaulted general contractor. Work
included meeting project budget and fast track
completion schedule for customer. fire alarm, communications
and lighting in each station were installed. |
Bayswater
Peaking Plant |
|
Owner: |
Florida
Power & Light |
Location: |
1425 Bay 24th Street
Far Rockaway, NY |
Client: |
Foster & Wheeler |
Value: |
$6,295,000 |
|
E-J
was brought into this Peaking Plant project with
only 8 weeks remaining when the existing contractor
couldn’t perform. Florida Light & Power
committed to sell electricity, with financial penalties
if the date wasn’t met. E-J mobilized sixty
electricians within two weeks, including engineering
and project management staff. 8 week fast track
installation of a Pratt Whitney FT-8 twinpack 50-megawatt,
gas fired simple cycle peaking unit including turbines,
site work, feeders and all associated balance of
plant systems. These included de-mineralized water,
CEM’s, SCR, gas compressor, oily water separators
and switchgear from 120V to 69kV. In addition,
E-J was also responsible for the installation of
site lighting, heat trace, grounding lightning
protection, cathodic protection, fire detection
and protection, gas detection and all low voltage
communication systems such as telephone, CAT 5
and fiber optic WAN/LAN Systems. |
Throgs Neck
Bridge – Rehabilitation of Electrical Systems |
|
Owner: |
MTA Bridges
and Tunnels |
Location: |
Throgsneck Bridge
Bronx/Queens, NY |
Client: |
First Indemnity Insurance |
Value: |
$6,121,000 |
|
Completion
of the entire electrical system at the Throgs Neck
Bridge. The 5kV Substation furnished all power
to the Throgs Neck Bridge, Operational Building,
Toll Complex and Maintenance Facility. Safety requirements
included boat patrol during working hours. |
Nevins Street
Transit Station |
|
Owner: |
NYC Transit |
Location: |
Nevins Street & Flatbush
Avenue
Brooklyn, NY |
Client: |
Reliance Surety Insurance
Co. |
Value: |
$4,368,000 |
|
$4.5
million rehabilitation of major NYC Transit Authority
Station in Brooklyn. Handled completion of all
remaining general construction and electrical work
for bonding company when previous general contractor
went into bankruptcy. |
425 Lexington
Avenue |
|
Owner: |
Olympia & York |
Location: |
425 Lexington Avenue
New York, NY |
Client: |
Crow Construction Co. |
Value: |
$4,000,000 |
|
Complex
625,000 sq. ft., 40-story new office building project
across from Grand Central Station which E-J Electric
was awarded when the original contractor forfeited
their bond at 50% complete. All lighting, power,
and Fire Alarm systems were included in the project.
E-J met critical installation dates to insure a
certificate of occupancy for the owner. |
Manhattan
Bridge |
|
Owner: |
Dept of
Transportation |
Location: |
Manhattan Bridge
New
York, NY |
Client: |
Yonkers Contracting |
Value: |
$4,000,000 |
|
Completion
contract covering upgrade power and lighting of
Manhattan Bridge and installation of Traffic Control
System. |
One Jamaica
Center |
|
Owner: |
Mattone
Group |
Location: |
One Jamaica Center
Jamaica, NY |
Client: |
Stegla Group. |
Value: |
$3,250,000 |
|
Completion contract for Keyspan on Major retail/theatre project revitalizing Jamaica, New York. Fast-track 12-week installation peaked at 85 men in four weeks when Keyspan’s electrical division couldn’t perform. Substantial shared savings were earned through this teaming approach. Project included (3) 4000 amp services, feeder panels, branch lighting and power, fire alarm, telephone, MCC and motors for retail space, theater space and commercial garage. All violations were repaired to obtain electrical permit for entire work. |
Brooklyn
College Fire Alarm |
|
Owner: |
Brooklyn
College |
Location: |
2900 Bedford Avenue
Brooklyn, NY |
Client: |
Turner Construction
Co. |
Value: |
$2,352,000 |
|
Fast
track take-over project for bonding company of
a multi-building fire alarm system installation.
The Simplex fire alarm system was the final part
of a new construction project required to obtain
certificate of occupancy for the owners. |
Airtrain |
|
Owner: |
ARTC |
Location: |
JFK IAT, JFK International
Airport
Jamaica, NY |
Client: |
Slattery |
Value: |
$1,100,000 |
|
Completion of electrical work on JFK International Airport's Airtrain System included track lighting, signal, and station work. Airtrain is a ten station 8.4 mile automated, driverless, standard gauge steel rail system operating over an exclusive, mostly elevated guideway. Airtrain connects JFK Central Terminal Area consisting of six stations linking nine terminals to the Howard Beach Subway Station, Long Term Parking Station, Federal Circle Car Rental Station, and Jamaica LIRR/Subway Station. |
PS 139 |
|
Owner: |
NYC School
Construction Authority |
Location: |
330 Rugby Road
Brooklyn,
NY |
Client: |
Travelers Insurance |
Value: |
$850,000 |
|
General
Contractor for the completion of default contract
of PS 139 in Brooklyn. Masonry, roof, electrical
and window repair work were included in the project
scope. |
PS 167 |
|
Owner: |
NYC School
Construction Authority |
Location: |
1025 Eastern Parkway,
Brooklyn, NY |
Client: |
Travelers Insurance |
Value: |
$700,000 |
|
General
Contractor for the completion of default contract.
Completion of masonry, roof, window repair work
and punch list were included in the project scope. |
Symphony
Space Theater |
|
Owner: |
Symphony
Space |
Location: |
2537 Broadway
New
York, NY |
Client: |
Shamus Henshy & Associates |
Value: |
$515,000 |
|
Installation
in theatre of data, communications, security, video,
audio and dimmer light systems for America's Leading
Community based arts organization. Brought aboard
as completion contractor by the owner with six weeks
remaining before sold out performances opened.
Completed the project for opening night. |
Arthur Kill
Staten Island Landfill High Voltage Distribution |
|
Owner: |
NYC Dept.
of Sanitation |
Location: |
Arthur Kill Staten
Island Land Fill
Staten Island, NY |
Client: |
Interstate |
Value: |
$300,000 |
|
Installed
5kV overhead distribution on poles over the Arthur
Kill Staten Island Landfill. E-J was brought on
by the general contractor for our high voltage
and completion work ability. |
College
Point Bus Terminal |
|
Owner: |
NYC Department
of Transportation |
Location: |
College Point, New
York |
Client: |
Colonia Insurance |
Value: |
$3,200,000 |
|
E-J was awarded a lump sum completion project by Colonia Insurance to replace the existing contractor. The bus maintenance and Service facility for the Department of Transportation consisted of central office and bus cleaning facility, refueling and total maintenance garage, CNG bus refueling plant, and outside lighting. The project included two complete buildings with separate 2000 Amp service and distribution including overhead distribution installation, connection and testing of all maintenance equipment, Public Address system, fire alarm system, security system, and lighting. |
Port Authority
Bus Terminal |
|
Owner: |
Port Authority
Bus Terminal |
Location: |
New York, New York |
Client: |
ESA/USA |
Value: |
$460,000 |
|
A
Completion Contract for automation of the Port
Authority Bus Terminal’s control systems. |
|