E-J Electric Installation Co.

Mutual Electric - Retail Division

 

Retail Facilities

spacer

Victoria’s Secret


Owner: Limited Store Planning
Location:    1328 Broadway/Herald Square
New York, NY
Client: Fisher Development
Value: $2,328,000

Work consisted of the installation of new electrical service from Con Edison, which required advisory board filing with the City of New York, four floors of custom lighting system, custom millwork lighting, the installation of audio/visual system consisting of a sound system and multiple plasma screens, camera surveillance system, card access for private areas, wiring for A/C equipment and control wiring.

Salvatore Ferragamo, Trump Tower


Owner: Salvatore Ferragamo
Location:    Trump Tower - 725 5th Avenue
New York, NY
Client: Sweet Construction
Value: $400,000

Performed a complete electrical installation and power for Ferragamo Flagship stores in Trump Tower in Men's, Women's and Boutique.

Abercrombie & Fitch


Owner: Abercrombie & Fitch Inc.
Location:    720 Fifth Avenue
New York, NY
Client: Mackenzie Keck
Value: $2,250,000

New York Flagship for Abercrombie & Fitch, includes lighting, power, service work, generator installation and HVAC wiring.

Bloomingdale's 1st and 2nd Floor


Owner: Federated Department Store
Location:    1000 Third Avenue
New York, NY
Client: Seaboard Construction
Value: $1,028,000

E-J installed lighting and power at the Manhattan-based Bloomindgales 1st and 2nd floors.

One Jamaica Center


Owner: Mattone Group
Location:    One Jamaica Center
Jamaica, NY
Client: Stegla Group.
Value: $3,250,000

Completion contract for Keyspan on Major retail/theatre project revitalizing Jamaica, New York. Fast-track 12-week installation peaked at 85 men in four weeks when Keyspan’s electrical division couldn’t perform. Substantial shared savings were earned through this teaming approach. Project included (3) 4000 amp services, feeder panels, branch lighting and power, fire alarm, telephone, MCC and motors for retail space, theater space and commercial garage. All violations were repaired to obtain electrical permit for entire work.

Hugo Boss @ Time Warner Center


Owner: Hugo Boss USA, Inc.
Location:    10 Columbus Circle
New York, NY
Client: Fisher Development, Inc.
Value: $366,300

Hugo Boss is a high profile store at the new Time Warner Center which consisted of the installation of fire alarm systems, custom audio/visual system, installation of speaker system, plasma screens and video recorders, security system including surveillance cameras, custom lighting installation, installation of intricate millwork, lighting for displays and showcases, power wiring for A/C and low voltage control wiring.

Tower Records - Trump Tower


Owner: Tower Records
Location:    725 5th Avenue
New York, NY
Client: Patella Construction
Value: $300,000

Installed Fire Alarm, lighting, power and audio for premier retail store in Trump Tower Atrium.

Gift Building


Owner: Chrysanthemum
Location:    225 Fifth Avenue
New York, NY
Client: Gift Building
Value: $3,620,000

Showroom building consisting of 12 floors with multiple tenants/vendors. The work consisted of diversified showroom lighting, maintaining dimming board system for the main lobby and the majority of building maintenance.

Empire State Building


Owner: Helmsley Spear
Location:    350 5th Avenue
New York, NY
Client: Various
Value: $2,300,000

Office building/Landmark building consisting of 102 stories. Service landlord & tenants and for lighting and power as well as engineering and designing construction jobs. Maintain lighting, power, radio station, telephones, data, A/C. Handle tenant needs and new showrooms.

GAP Flagship @ 42nd Street


Owner: GAP, Inc.
Location:    1442 Broadway
New York, NY
Client: Fisher Development
Value: $2,260,000

This work completed at the GAP Flagship store in New York’s Times Square at 42nd Street and Broadway, consisted of the installation of a fire alarm system, custom audio/visual system, speaker system, security system with card access, custom lighting, millwork wiring, A/C power wiring and control wiring.

Old Navy


Owner: GAP, Inc.
Location:    Main Street/Roosevelt Avenue
Flushing, NY
Client: Fisher Development
Value: $2,194,000

This new Old Navy store project in Queens, NY for the GAP, consisted of the installation of a Fire Alarm System, Speaker System and Security System as well as the wiring for the lighting and power and mechanical system.

International Toy Center


Owner: Wein Malkin / Helmsley Spear
Location:    200 5th Avenue
New York, NY
Client: International Toy Center
Value: $2,000,000

E-J has a permanent satellite office at this Showroom Building/Landmark Building. We are in charge of the maintenance on all fifteen floors, the major International Toy Show every February with temporary set-ups for multiple vendors and the monitoring of the electrical system during Toy Trade Show. We also design/build jobs, do emergency on-call work, service calls and estimating, etc.

Bronx Zoo - Lakeside Café


Owner: NY Zoological Society
Location:    Bronx Zoo
Bronx, NY
Client: Barney Skanska
Value: $1,550,000

Retail building renovation and new construction of a large restaurant. We installed general lighting and power, lighting controls, and fire alarm.

Lord & Taylor Computer Room Emergency Backup


Owner: Lord & Taylor
Location:    424 5th Avenue
New York, NY
Client: Lord & Taylor
Value: $1,100,000

Design/Build of a UPS installation for Lord & Taylor’s national computer system, including battery backup, emergency generation and all electrical and mechanical systems.

Banana Republic @ 86th Street


Owner: GAP, Inc.
Location:    86th Street & 3rd Avenue
New York, NY
Client: Fisher Development
Value: $540,000

Work consisted of the installation of a fire alarm system, custom lighting system, custom millwork lighting, speaker system, security system, A/C power wiring and A/C control wiring.

Champs @ 42nd Street


Owner: Foot Locker
Location:    42nd Street/Times Square
New York, NY
Client: Fisher Development
Value: $439,800

Work consisted of the installation of a fire alarm system, custom theatrical lighting installation, power wiring for A/C and low voltage control wiring and custom audio/visual system wiring only equipment, installed by others. Additional systems included speaker system, security system and the wiring for the lighting, power and mechanical system.

Toys R Us


Owner: Toys R Us
Location:    1530 Broadway
New York, NY
Client: F.J. Sciame Construction
Value: $6,200,000

Toys R Us is a flagship 100,000 sq. foot retail store spread over four floors; Subceller, Concourse, Ground & 2nd Floor in the center of Times Square. E-J Electric provided two new 6000A service switchboards, complete electrical distribution system, automatic transfer switches, 810kW emergency generator, and wiring for motors, pumps, conveyor systems, heating, air conditioning, and ventilation loads.

Dreams like a 60-foot high Ferris Wheel with fourteen individual themed cabs that will greet customers as they walk into the store. A life-size two-story dollhouse with its own elevator and grand staircase.

Terminal 4 – International Arrivals Terminal JFK


Owner: IAT LLC
Location:    JFK International Airport
Jamaica, NY
Client: AMEC Construction Management, Inc.
Value: $34,500,000

The Terminal 4 project included a new 1.5 million square foot Terminal in JFK International Airport. E-J provided all power and lighting, lighting control system, deluge system, metering system and SCADA system. State-of-the-art architectural lighting was placed throughout the terminal. The three level glass walled central terminal building services 35 US and International carriers. There is an 850 foot long retail hall and the top level has a 500x400 departure lobby and 144 check-in positions. There is an 850 foot long retail hall. Special installations were performed for the International and US customs Departments. JFK's first Air Transit Station inside of a terminal is located between levels.

Warner Brothers Studio Store


Owner: Warner Brothers
Location:    1 Times Square
New York, NY
Client: F.J. Sciame Construction
Value: $4,100,000

Eleven week $4.1 Million project that opened on time and within budget. Involved working two shifts with 65 men including weekends. The project included coordination with ConEdison to turn on a new 4000 amp service as well as a installation of a completely new fire alarm system for the entire 22-story building required for a Certification of Occupancy. Additional work included the installation of telephone and video systems.

Avon Global Image Center


Owner: Avon Products Inc.
Location:    Trump Tower @ 725 5th Ave
Client: Sciame Construction Co.
Value: $1,200,000

Flagship store for Avon at Trump Tower consisting of retail, salon, spa, offices and convention center. Installed lighting, power, dimming, fire alarm, security and audio/video.


E-J Electric Installation Co.     |     46-41 Vernon Boulevard     |     Long Island City, NY 11101     |     Phone: 718-786-9400     |     Fax: 718-937-9120     |     Email: ejelectric@ej1899.com